Use the arrows to scroll through the images.
Belgravia Apartment
The complete refurbishment of the top two floors of an apartment in Belgravia completed in December 2008. GRA successfully gained permission for re-constructing the top floor to create a roof terrace with far reaching views over London.
The interior space of the apartment was then re-ordered to provide a three bedroom, three bathroom elegant London home.
The interior space of the apartment was then re-ordered to provide a three bedroom, three bathroom elegant London home.